Home Community Insights The Renovation Step Most Homeowners Leave Too Late: Planning Your Heating

The Renovation Step Most Homeowners Leave Too Late: Planning Your Heating

The Renovation Step Most Homeowners Leave Too Late: Planning Your Heating

Everyone knows what their dream new kitchen looks like, or wants to visualise their larger window openings, or that new carpet/wooden flooring. But your heating system? Rarely a consideration, even during large-scale renovations of a property.

Yet decisions about your heating will dictate the routing of pipework, floor construction and the order of works required by subsequent trades, and so on. Postponing can lead to numerous knock-on effects and additional works/costs that were not originally envisaged.

It should be factored into the start of any house renovation and form part of your overall house renovation cost calculations.

This article covers:

  • Why putting it off can lead to costly remedial works
  • Why you should conduct a heat loss assessment
  • Ensuring room layouts accommodate your heating requirements
  • Impact on your house renovation cost
  • Incorporating works into your project build programme
  • Considerations to make prior to finalising costs
  • Summary

Why putting it off can lead to costly remedial works

Pipework will frequently need to be routed through wall or floor voids, meaning that it becomes inaccessible once boarded up, tiled, plastered, painted, etc. Any alteration, no matter how trivial, could therefore incur reworks and costs.

Perhaps your desired kitchen has increased unit heights, obscuring a current radiator? Relocating ahead of your new flooring would be significantly simpler, whereas you’d then need to lift floorboards, adapt/re-route pipework and rectify the floor (at extra cost). As well as incurring additional cost for your heating engineer, this could disrupt your builders’ programme, incur further materials, impact following trades, etc. Hence, allowing access to pipework, boilers, radiators, etc. is important at an early stage of the renovation.

You can obtain quotes from heating engineers throughout the UK at www.myjobquote.co.uk/heating-engineer to discuss and factor in works, such as relocating radiators, boilers, etc., to the earlier phases of your build.

Notably, space heating was responsible for ~60.8% of total domestic energy demand in the UK in 2025, based on Government projections published in September 2026, further emphasising its importance as an integral element to consider in a renovation scheme.

Why you should conduct a heat loss assessment

Simply adding an extension or increasing room volume does not necessarily dictate a requirement to upgrade to a higher-rated heat source. By installing enhanced insulation, windows, etc. you may in fact reduce your overall heat loss.

Having a qualified engineer perform a heat loss assessment on your new rooms, taking account of your revised plans, will help establish the heat output required per room, from radiators, underfloor heating, etc., and allow the engineer to comment on the suitability of your current heat source or quote for new installation accordingly.

There may be a number of radiators, for example, that remain fit-for-purpose, or you may identify radiators requiring a larger/smaller unit or repositioning. All should be taken into account when planning.

Similarly, depending on the scale of your works, you may wish to take this opportunity to install a heat pump, benefiting from lower flow temperatures, which will drive your requirements for e.g. radiators, UH, etc. and hence should be discussed prior to specifying the relevant equipment, along with your building works and design.

Ensuring room layouts accommodate your heating requirements

Your final room specification, including furniture placement, should consider where radiators, pipework, UH, hot water cylinders, controls, etc. can best be incorporated, i.e. to ensure adequate room clearance, etc. This may, for instance, preclude installation of a conventional radiator next to floor-to-ceiling glazing, or influence placement of your heated towel rail, and should be determined and communicated to all parties prior to progressing the build, including:

  • placement of radiators, allowing clearance and optimal heat dispersion, accounting for new furniture, windows, doors, etc;
  • routing of pipework, identifying areas requiring opening and maintaining future access where possible;
  • type and extent of UH, informing decisions around floor build-up, etc. noting that water-fed/electrical installations differ;
  • location of any room thermostats, controls, etc. for ease of accessibility; and
  • hot water storage, ensuring provision of pipework & adequate space, if applicable to the system installed.

All information should be captured on an updated floor plan, ensuring tradesmen and yourself know where elements are to be situated and are able to work accordingly.

Impact on your house renovation cost

Costs can vary enormously depending on your scheme, but don’t simply focus on the cost of a heat source/radiators, etc. Retaining your current radiators, for example, could incur minimal cost, but relocation across a room would necessitate longer pipework, floor disruption, additional labour, etc., whilst adding an extension could trigger changes/upgrades to your current system, controls, etc.

Ensure the following are itemised when reviewing costs:

  • design, including any heat loss calculations, visit, assessment, etc;
  • installation, including supply of heat source, radiators/UH, associated pipework, controls, valves, etc. and labour;
  • making good, such as re-instating floor, infilling, re-plastering, decorating; and
  • commissioning, cleaning, etc. and removal of existing plants, as necessary.

Clarify responsibilities with the relevant contractor(s) (builder, heating engineer, etc.) as some of these items may fall outside their remit and be erroneously assumed included in another’s quotation, thereby leading to additional unaccounted costs later on. Similarly, clarify any on-site variations and incorporate an allowance into your house renovation budget, agreeing to authorise works in writing prior to undertaking, as further remedial works may arise, such as upon encountering dilapidated pipework, etc.

Where applicable, also confirm your eligibility for the Boiler Upgrade Scheme, available to homeowners in England & Wales, to subsidise installation of a qualifying heat pump and ensure this is reflected in your estimate, subject to meeting eligibility criteria and engaging a qualifying installer.

Incorporating works into your project build programme

As mentioned, it is beneficial to incorporate heating elements into your build as early as practicable, though it is unlikely that the final installation will be undertaken at this point; rather, this will enable you to facilitate the installation, e.g. providing access, etc. to your heating engineer, in a logical sequence, such as:

  1. Finalise your layout, including placement of furniture, room utilisation, level of insulation, floor finish, etc;
  2. Complete the heating design, enabling your engineer to survey, identify pipework, confirm equipment, controls, etc.; and
  3. arrange first fix, ensuring your installer can access the property, ideally prior to any floor/tile/plaster works; and
  4. communicate this to subsequent trades, e.g. electrics, floor, making good, etc; and finally
  5. commission, test, correct, etc. as necessary and hand over to yourself.

Additionally, ask the heating installer, where applicable, at what periods you will be without heat/hot water, particularly if you intend to continue occupying the property during the works.

Ensure the heating engineer is registered and appropriate for the relevant Gas Safe competencies if undertaking any works with gas, as a mandatory legal requirement in Great Britain for anyone working, whether employed or not, on any domestic gas appliance/fuel appliance.

Considerations to make prior to finalising costs

Finally, ensure you can cross-reference your floor plan and identify on the quotation the selected heat source, radiators, etc. and locations, avoiding any ambiguity and potential additional unforeseen works, e.g. a blanket statement such as “amendments to central heating”, etc. could prove problematic!

Identify if/what elements are to be purchased, by whom, who will receive, inspect, etc. goods, and seek clarification if any alternative product is to be substituted, as well as terms of payment and documentation, such as commissioning, etc. upon completion, and retain copies of all, with updated floor plan, for ease of reference during your renovation.

Summary

The heating elements of your renovation project can easily be neglected, particularly considering the concealed nature of pipework, etc. within the final fabric of your property, and as such it is advisable to address them as far as is reasonably practicable at the outset, to minimise potential disruptions, knock-on costs and facilitate your house renovation cost forecasting before more substantial build-out and finishing works are carried out.